Aicaigou LogoB2B WikiIndustrial Encyclopedia

XJ250 Workover Rig

Updated: 2026-07-15

Overview

The XJ250 Workover Rig is a heavy-duty mobile unit engineered for servicing and repairing oil wells. It combines a telescopic derrick, hydraulic power system, and integrated controls to perform tasks like pulling tubing, replacing downhole equipment, and wellbore cleaning. Designed for onshore operations, it meets API and regional safety standards. Its modular design allows customization for specific well conditions, making it a versatile asset for oilfield service companies.

Structure and Working Principle

手推路面吹风机 施工地面清扫机 结构紧凑 运转灵活山东龙煤工矿机械集团有限公司

The rig comprises a carrier truck, derrick (typically 18–25m), drawworks, hydraulic power pack, and control cabin. The derrick’s telescopic design enables compact transport and quick setup. During operation, the drawworks spool manipulates drill pipes or tools via a traveling block system. Hydraulic cylinders provide precise positioning, while the control system monitors load and pressure in real time. The rig’s 250-ton hook load capacity handles most workover scenarios in medium-depth wells.

商家经验真实案例 · 安全可信
播种机吊卸指南
本文详细介绍了播种机吊卸的步骤、注意事项以及常见问题的解决方法,帮助用户安全高效地完成播种机的吊卸工作。

Key Features

1. **High Load Capacity**: Handles strings up to 7,000m in wells with ≤250-ton workloads. 2. **Mobility**: Mounted on a heavy-duty truck chassis for rapid deployment between sites. 3. **Safety Systems**: Includes anti-drop mechanisms, overload alarms, and emergency brakes. Automated pipe handling reduces manual labor, while corrosion-resistant materials extend service life in saline or H2S environments. Optional features like winterization kits adapt to Arctic conditions.

Application Areas

Primarily used in: - **Workover Operations**: Replacing pumps, repairing casings, or clearing obstructions. - **Well Stimulation**: Facilitating acidizing or fracturing jobs. - **Abandonment**: Plugging depleted wells. The XJ250 suits onshore fields with well depths of 3,000–5,000m. Its compact footprint is ideal for congested oilfields or environmentally sensitive areas where larger rigs are impractical.

Maintenance and Precautions

旋塞阀 高压管汇 压裂设备 BOP ZJ钻机 修井机 石油配件 压裂车衡水朗峰能源装备有限公司

**Daily Checks**: Inspect wire ropes, hydraulic leaks, and structural integrity. Lubricate moving parts per manufacturer guidelines. **Major Maintenance**: Overhaul the drawworks and hydraulic system every 2–3 years. Replace critical load-bearing components after 5 years or 10,000 operating hours. Operators must undergo API-approved training to prevent accidents. Avoid exceeding rated loads or operating in winds >45 km/h. Store the rig with the derrick lowered to minimize weather exposure.

商家经验真实案例 · 安全可信
抽水气囊结构
本文深入解析抽水气囊的结构设计原理,从主体材质到密封系统,再到创新应用场景,帮助读者全面了解这一高效排水工具的内部构造和工作机制。

B2B Procurement Guide

1. **Supplier Evaluation**: Prioritize manufacturers with ISO 9001/API Q1 certification and field-proven designs. 2. **Configuration**: Specify well depth, climate requirements, and ancillary tools (e.g., blowout preventers). 3. **Logistics**: Verify road transport permits for oversized loads. Lead times typically range 3–6 months. Consider bundled service contracts for maintenance. Used units (3–5 years old) may cost 40–60% less but require thorough inspection.

Related Manufacturers