Aicaigou LogoAicaigou LogoB2B WikiIndustrial Encyclopedia

Wedge-type Clamp

Updated: 2026-08-05

Overview

The GB Wedge Clamp is a critical component in China's power transmission infrastructure, designed to meet the GB/T 23234 standard for overhead line fittings. These clamps utilize a wedge-shaped cavity that compresses onto conductors when tension is applied, creating a reliable mechanical and electrical connection without the need for splicing. Their standardized design ensures interoperability across China's national grid network. Primarily used by state grid corporations and electrical contractors, wedge clamps accommodate various conductor types including ACSR (aluminum conductor steel reinforced) and AAAC (all aluminum alloy conductor). The GB certification guarantees performance under specified mechanical loads and environmental conditions, making them essential for both new installations and maintenance projects.

Structure and Working Principle

UT线夹 NUT-1国标热镀锌可调式电力电缆连接拉线楔形固定金具厂家河北维卡电力器材制造有限公司

The clamp consists of three main components: a wedge body, keeper plate, and locking pin. The wedge body features a tapered groove that matches the conductor diameter, while the keeper plate secures the assembly. When installed, the conductor is placed in the groove, and tension forces drive the wedge downward, creating increasing friction. This self-tightening mechanism distributes mechanical stress evenly across the conductor surface, preventing localized damage. The design maintains conductivity through surface contact pressure rather than penetration, preserving the conductor's integrity. For earth wire applications, some models include additional corrosion-resistant coatings to withstand grounding currents.

商家经验真实案例 · 安全可信
砌砖拉线全攻略
本文详解砌砖时水平线的三种实用拉法,从基础工具准备到进阶技巧,手把手教你用简易工具实现墙面平整,解决新手常见的垂直线偏移问题。

Key Features

GB-compliant wedge clamps offer several technical advantages. Their hot-dip galvanized steel variants provide over 50μm zinc coating for corrosion protection in coastal or industrial areas. Aluminum alloy versions reduce weight by approximately 30% while maintaining tensile strength. The clamps' installation requires no special tools - tension from the line itself activates the wedge mechanism. Field tests show maintained grip strength even after 1000+ thermal cycles (from -40°C to 80°C). Most models achieve 90-95% of conductor breaking strength, exceeding IEC 61284 performance requirements for overhead line fittings.

Application Areas

These clamps serve three primary applications: dead-end terminations for conductors, mid-span repairs, and vibration damper installations. In ultra-high voltage (UHV) projects above 500kV, specially rated versions handle increased mechanical loads. Beyond power transmission, adapted models are used in railway catenary systems and temporary construction power setups. Recent developments include composite insulator-compatible designs for compact line configurations. Provincial grid companies typically specify exact model numbers based on regional wind/ice load calculations per GB 50545 standards.

Maintenance and Precautions

JXD JXL系列安普线夹楔形弹力线夹C型并沟线夹国标非标 耐用任丘市星芒商贸有限公司

Proper installation requires matching the clamp to conductor diameter within ±0.5mm tolerance. Over-tightening during installation may cause premature strand breakage, while under-tightening risks slippage. Annual inspections should check for galvanization wear exceeding 20% of original thickness. In coastal areas, stainless steel keeper plates are recommended to prevent bimetallic corrosion. Damaged wedges showing deformation or cracking must be replaced immediately, as their holding capacity cannot be reliably restored. Storage should avoid moisture accumulation in the wedge cavity to prevent oxidation affecting conductivity.

商家经验真实案例 · 安全可信
空中输电原理解析
本文生动解析电能在空中无导线传输的三大核心技术原理,包括电磁感应、微波辐射与激光输电的应用场景及技术特点,揭开无线电力传输的神秘面纱。

B2B Procurement Guide

Bulk purchasers should verify suppliers' GB/T 23234 certification and request batch test reports for mechanical properties. Standard packaging includes 25-50 units per crate with moisture-proof desiccant. Lead times range from 15-30 days for common models, with express production available at 20-30% cost premium. Quantity discounts typically apply at 500+ unit orders, with price breaks at 2000+ units. Some manufacturers offer conductor-specific versions (e.g., for JL/G1A-240/30 type) with optimized groove designs. For export markets, ensure clamps carry both GB and IEC 61284 markings for broader acceptance.

Related Manufacturers