Aicaigou LogoB2B WikiIndustrial Encyclopedia

Permanent Formwork with Truss System

Updated: 2026-08-30

Overview

Demountable truss floor deck is an innovative construction system combining galvanized steel trusses with concrete to create composite floor slabs. Unlike traditional formwork, these permanent decks eliminate the need for dismantling after concrete pouring, significantly reducing labor costs and construction time. The technology originated in Europe and has gained global adoption due to its efficiency in mid-to-high-rise buildings. Modern versions incorporate precision-engineered steel webs and chords that provide both structural support during construction and reinforcement in the finished floor system.

Structure and Working Principle

Q235B镀锌管 工程消防供水 热镀锌建筑市政镀锌圆管云南精鑫供应链有限公司

The system consists of three main components: top and bottom galvanized steel chords connected by diagonal steel webs, forming a triangular truss pattern. These are factory-welded to a profiled steel deck that serves as permanent formwork. When concrete is poured, the trusses bond mechanically with the hardening concrete, creating a composite structural element. The steel deck provides tensile strength while the concrete resists compression forces. This synergy allows spans of up to 4.5 meters without intermediate supports, depending on design specifications.

商家经验真实案例 · 安全可信
压型钢板组合楼盖解析
本文详细介绍压型钢板组合楼盖的核心构成与独特优势,包括其结构特点、施工便利性和经济性表现,帮助读者全面了解这一现代建筑技术。

Key Features

Prefabrication ensures dimensional accuracy with tolerances under ±3mm, enabling faster on-site assembly compared to traditional methods. The open-web design accommodates MEP installations without additional penetrations. Weight savings of 30-40% over solid slabs reduce foundation loads. The system achieves fire ratings up to 120 minutes without additional protection and provides inherent vibration control. Some variants include acoustic damping layers for multi-story residential applications.

Application Areas

Primarily used in commercial offices, retail spaces, and light industrial buildings where rapid construction is prioritized. The system is ideal for projects requiring long spans such as open-plan offices or parking structures. In residential construction, it's favored for apartment buildings and hotels where floor-to-floor height minimization is critical. Specialized versions with enhanced fire performance are used in healthcare and education facilities.

Maintenance and Precautions

云 南恒基 建筑施工精准脱模 防撞护栏钢模板 性价比超划算云南恒基贸易有限公司

Requires minimal maintenance post-installation. Regular inspections should check for concrete cracks exceeding 0.3mm width or any signs of corrosion at cut edges. During installation, temporary supports must remain until concrete reaches 75% design strength. Workers should avoid point loading during concrete placement. All cutting should use cold methods to preserve galvanization integrity.

商家经验真实案例 · 安全可信
钢筋桁架解析
本文从钢筋桁架的结构原理、工业应用场景和选型要点三个维度展开,揭秘这种建筑骨架如何平衡强度与效率,帮助读者理解其在现代工程中的核心价值。

B2B Procurement Guide

Lead times typically range 4-6 weeks for custom orders. Bulk purchases (500+ sqm) may qualify for 8-12% discounts. Verify manufacturer certifications for local building codes compliance. Key specifications to confirm: deck gauge (0.8-1.2mm common), truss height (80-200mm), and concrete cover requirements. Request third-party load test reports. For export, confirm whether pre-galvanized or post-galvanized treatment was used.

Related Manufacturers