Aicaigou LogoB2B WikiIndustrial Encyclopedia

PE Pipe Liner

Updated: 2026-07-20

Overview

PE geomembrane is a synthetic liner made from high-density (HDPE) or low-density polyethylene (LDPE), engineered to prevent fluid migration in construction and environmental projects. Its primary role is to act as a barrier against seepage in applications such as waste containment, water storage, and soil stabilization. The material's versatility stems from its customizable thickness, texture (smooth or textured for friction), and additive packages to enhance UV resistance or flexibility. Polyethylene geomembranes are favored over traditional materials like clay or concrete due to their lightweight nature, ease of installation, and superior impermeability. They are manufactured through extrusion or calendering processes, ensuring uniform density and minimal defects. Standards such as GRI-GM13 (Geosynthetic Research Institute) and ASTM D7176 govern their quality and performance metrics.

Physical and Chemical Properties

土工膜 垃圾场填埋矿区人工湖黑膜 鱼塘养殖防水膜 隧道河道防渗膜德州高宏新材料有限公司

PE geomembranes exhibit exceptional physical properties, including tensile strengths ranging from 20-40 MPa (HDPE) and elongation at break up to 700% (LDPE), allowing them to withstand ground movement and stress cracks. Their chemical resistance covers pH ranges of 1-14, making them suitable for acidic or alkaline environments like mining leachate ponds. Additives like carbon black (2-3%) provide UV stability for outdoor use, extending service life to 20+ years. Thermal properties include a melting point of 120-135°C (HDPE), ensuring stability in most climatic conditions. The material's low permeability coefficient (<1×10⁻¹³ cm/s) effectively blocks water and gas diffusion. Density variations between HDPE and LDPE allow tailored flexibility—HDPE offers rigidity for heavy loads, while LDPE adapts to uneven surfaces.

商家经验真实案例 · 安全可信
水保工程生态袋用的土壤
本文解析水保工程中生态袋填充土壤的选择要点,包括土壤类型、配比要求及功能特性,帮助读者了解如何通过科学选土提升生态袋的护坡效果和环境适应性。

Main Applications

In civil engineering, PE geomembranes line landfills to prevent toxic leachate from contaminating groundwater. They are also used in tunnel waterproofing, where their seamless welding capability ensures leak-proof joints. Environmental projects include decorative ponds and wastewater treatment lagoons, where fish-safe LDPE variants are common. The mining industry relies on thick (2-3 mm) HDPE geomembranes for heap leach pads to contain sulfuric acid solutions. Agricultural uses cover irrigation canals and biogas digesters, leveraging the material's resistance to fertilizers and methane. Recent innovations include electrically conductive geomembranes for leak detection in fuel storage facilities.

Safety and Storage

高强度拉伸 资质齐全 建通工程 垃圾填埋场防渗 HDPE 土工膜 施工方便山东建通工程科技有限公司

While PE geomembranes are inert and non-hazardous, precautions are necessary during handling. Sharp tools or abrasive surfaces can puncture sheets; thus, subgrade preparation (removing rocks) is critical. Workers should wear cut-resistant gloves and knee pads during unrolling and welding to prevent injuries. Storage requires protection from direct sunlight to prevent pre-installation UV degradation. Rolls should be stored upright on pallets in a dry, cool (<40°C) warehouse. Avoid stacking rolls unevenly to prevent deformation. For fire safety, keep away from open flames—thermal welding equipment must be used in ventilated areas to avoid fume accumulation.

商家经验真实案例 · 安全可信
黄金选矿剂配制
本文详解黄金选矿剂的配制原理与实用方法,包括常用化学试剂选择、配比优化技巧及操作注意事项,帮助从业者提升矿物分离效果。

B2B Procurement Guide

Procuring PE geomembranes requires technical specifications: thickness (0.5 mm for landscaping, 2.5 mm for landfills), width (2-8 m rolls to minimize seams), and material grade (virgin resin vs. recycled content). Certifications like NSF-61 (potable water contact) or GM19 test reports validate performance. Request samples to check for consistency in texture and thickness tolerance (±5%). Suppliers often provide welding services—confirm their crew's certification (e.g., ISO 9001 for quality management). Bulk orders (10,000+ m²) typically reduce costs by 15-30%. Lead times vary from 2-6 weeks; expedite fees apply for urgent projects. Consider regional logistics: wider rolls may incur higher freight costs due to oversized load regulations.

Related Manufacturers