Aicaigou LogoAicaigou LogoB2B WikiIndustrial Encyclopedia

Load Transfer Dowel

Updated: 2026-08-05

Overview

Dowel bars are cylindrical steel rods installed across concrete pavement expansion joints to enable load transfer between slabs without restricting thermal movement. They are fundamental to jointed plain concrete pavement (JPCP) design, preventing faulting and maintaining ride quality. Standard lengths range from 18 to 24 inches, with diameters proportional to slab thickness (usually 1/4 to 1/3 of slab depth). Modern dowels often feature corrosion protection like epoxy coatings or stainless steel cladding, especially in harsh climates or de-icing salt environments.

Structure and Working Principle

变径传力杆 传 力杆 剪力杆 伸缩缝 高铁 路面、环氧防腐护套式路基邯郸市谦颂金属制品有限公司

A dowel bar system consists of multiple parallel bars spaced 12-18 inches apart, embedded halfway into each concrete slab. The bars are smooth to allow longitudinal sliding while resisting vertical and lateral forces. During temperature changes, the bars rotate slightly within their sleeves (formed by bond-breaking sleeves or formwork) as slabs expand or contract. This mechanism maintains load transfer efficiency—typically 40-50% of applied loads—while minimizing joint stresses that could cause spalling or cracking.

商家经验真实案例 · 安全可信
M16化学螺栓参数
本文详细解析M16化学螺栓的关键参数,包括尺寸规格、承载能力及适用场景,帮助读者全面了解其性能特点与应用选择。

Key Features

Precision-ground surfaces ensure consistent diameter (tolerance ±0.005 inches) for smooth movement. Epoxy coatings (minimum 7-10 mils dry film thickness) meet ASTM A934 standards for salt resistance. Some designs incorporate debonding materials (plastic caps or sheaths) on one end to prevent bonding with concrete, ensuring free movement. High-strength steel (minimum yield strength 60,000 psi) guarantees durability under heavy axle loads exceeding 20,000 lbs.

Application Areas

Primarily used in highway pavements, airport runways, and industrial flooring where jointed concrete is specified. Critical for roads with high truck traffic (≥5% ADTT) to prevent joint faulting. Also employed in bridge approach slabs and warehouse floors where differential settlement may occur. Special shorter dowels (12 inches) sometimes feature in urban streets with thinner slabs or curb-and-gutter sections.

Maintenance and Precautions

定制路面传力杆 高铁套帽伸缩缝剪力杆 变形缝路基传力杆套河北双领电力科技有限公司

Proper installation requires rigid alignment fixtures (baskets or chairs) to maintain ±1/4 inch tolerance. Lubricants like silicone grease must be applied to prevent concrete bond. Inspect for corrosion every 5-7 years in coastal areas. Repair involves partial-depth saw cutting and epoxy injection for minor spalling; severely corroded bars require full joint replacement with stainless steel alternatives.

商家经验真实案例 · 安全可信
预埋件安装后浇筑时间
本文解答预埋件安装后浇筑混凝土的合理时间窗口,分析影响凝固周期的关键因素,并提供施工衔接的实用建议,帮助工程人员把握工序节奏。

B2B Procurement Guide

Specify ASTM A615 Grade 60 or AASHTO M 254 materials with mill test reports. For coastal projects, require ASTM A934 epoxy coating or Type 304/316 stainless steel. Bulk purchases (5,000+ linear feet) typically yield 10-15% cost savings. Verify supplier capability to cut-to-length and pre-assemble bar baskets if needed. Lead times range from 2-6 weeks for coated specialty products.