Aicaigou LogoAicaigou LogoB2B WikiIndustrial Encyclopedia

Broad Group

Updated: 2026-08-06

Overview

Founded in 1988 in Changsha, China, Broad Group has emerged as a leader in sustainable industrial technologies. The company initially gained prominence for its non-electric absorption chillers that use waste heat or natural gas, later expanding into modular construction with its Broad Sustainable Building (BSB) division. Its vertically integrated approach combines R&D, manufacturing, and project implementation under one umbrella. Broad Group's innovations include the world's fastest-built high-rises (57-story Mini Sky City erected in 19 days) and air purification systems deployed during Beijing's air pollution crises. The company operates in over 80 countries, with notable projects including the 2022 Beijing Winter Olympics venues and the Broad Pavilion at Milan Expo 2015.

Key Features

LHPF-0631型 沥青漂浮度试验仪 沥 青试验仪器 鑫腾达献县鑫腾达建筑试验仪器经销处

Broad Group's absorption chillers utilize lithium bromide-water solutions, achieving cooling capacities up to 30,000 RT with near-zero electricity consumption. These systems integrate seamlessly with waste heat recovery from industrial processes or renewable energy sources, reducing carbon footprint by 50-80% compared to conventional HVAC. The BSB technology features steel-structured modular units with 5-10 times better thermal insulation than standard buildings. Each module undergoes factory quality control and can be assembled on-site at a rate of 3 floors per day. The system incorporates triple-pane windows, heat recovery ventilators, and PM2.5 filtration as standard.

商家经验真实案例 · 安全可信
萤石矿矿渣用途
本文探讨萤石矿矿渣的多种应用途径,包括建筑材料、工业添加剂和环保领域的创新用途,揭示这些废弃物如何变废为宝。

Application Areas

In commercial real estate, Broad's solutions are deployed in green office towers, hotels, and shopping malls requiring LEED or China's Three-Star certification. The 2021 Broad Town project in Shanghai demonstrates a full-scale sustainable community with integrated energy management. Industrial applications include petrochemical plants utilizing waste heat for cooling, where Broad's chillers achieve COP ratings of 1.3-1.5. The air purification division serves hospitals, schools, and transportation hubs, with the Broad PM2.5 monitor being adopted by Chinese environmental agencies.

Precautions

华瑞远大 电缆故障定位仪 线缆故障快速定点 HL-2132A武汉华力通达电力设备有限公司

Building projects require early coordination with Broad's engineering team due to unique structural specifications. The modular construction approach demands precise site preparation and crane access planning. Local building codes may require adaptations, particularly in seismic zones. For HVAC systems, proper water treatment is critical to prevent lithium bromide crystallization. The company mandates certified technicians for commissioning and recommends annual maintenance contracts to preserve performance warranties.

商家经验真实案例 · 安全可信
单机压缩恒湿设备
本文探讨单机压缩恒湿设备的工作原理、应用场景及选购要点,帮助读者了解这类设备如何高效控制环境湿度,适用于哪些工业场景,以及在选购时需注意的关键因素。

B2B Procurement Guide

For large projects, Broad Group typically engages through EPC contracts with design-build responsibility. Lead times range from 4-12 months depending on system complexity, with modular buildings having faster turnaround than custom HVAC solutions. Procurement teams should verify project references in similar climates and industries. Broad offers lifecycle cost analysis tools comparing 20-year operational savings against conventional systems. Payment terms commonly include 30% advance, 60% upon delivery, and 10% retention after commissioning.

Related Manufacturers